The plumber and the electrician both were here on Monday, working their magic. We now have lights and switches in every room. We have a thermostat on the wall for the furnace. The heat pump is in. And we have hot and cold running water!
The carpenter is continuing to install the wraps around the windows and doors. I am attaching a few pictures so you can see. Again, the pictures do not do it justice. It is so pretty it almost makes me cry.
Here is a close-up of the crown molding. This tops all of the windows and doors.
This is the double door leading to the master bedroom.
This is the door leading outside from the master bedroom.
Here is an example of what the base molding looks like. (Notice the granite hasn't been replaced yet. That is suppose to happen today or tomorrow.)
Jim says he will be done with the finish work tomorrow. Ben says we will have our walk-thru tomorrow afternoon. It is my goal to have the final county inspection by Thursday of next week. So close!